Grade 1 in Gas & Oil
Grade 2 in Industry & Mine
Grade 4 in Power
Grade 5 in Construction
Our Clients
About Ideh
IDEH Engineering Company was established in 2002 as a System Integrator that mainly focused on the fields of Industrial Automation, Process Control and Instrumentation and then extended panel manufacturing, commissioning and procurement section to become as a EPC contractor.
Our emphasizing to have trained engineers and professional customer Support. Satisfy the customers by fulfilling our moral obligations and also our foreigner partners caused growing up rapidly.
Now within less than past 7 years, we could achieve and handle satisfactory the more than 70 different projects in different scales with covering wide range of applications such as Oil & Gas, Petrochemical, Steel, Automotive, Cement, Power Station, Food & Beverages…
About Ideh
IDEH Engineering Company was established in 2002 as a System Integrator that mainly focused on the fields of Industrial Automation, Process Control and Instrumentation and then extended panel manufacturing, commissioning and procurement section to become as a EPC contractor.
Our emphasizing to have trained engineers and professional customer Support. Satisfy the customers by fulfilling our moral obligations and also our foreigner partners caused growing up rapidly.
Now within less than past 7 years, we could achieve and handle satisfactory the more than 70 different projects in different scales with covering wide range of applications such as Oil & Gas, Petrochemical, Steel, Automotive, Cement, Power Station, Food & Beverages…
Our Fields of Activities
Electronical Protection & CCTV
Fire Alarms & Extinguishers
Mechanical and Civil
SCADA & Telemetry
Electrical Control & Instrumentation
Electrical Control & Instrumentation
Electronical Protection & CCTV
Fire Alarms & Extinguishers
Mechanical and Civil
SCADA & Telemetry
Grades & Standards
Brands
Brands
Projects
It is our absolute pleasure to have worked and have been working with some of the greatest companies in country and it is our goal to improve the quality of the industry through principle and accuracy.
Domestic Projects | Overseas Projects | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Finished | ||||||||||
EPCIC project, DCS, ESD (SIEMENS), F&G(Scame), field Instruments (Yokogawa), CV & ON/OFF valve (Valtek), PSV (Tosaca)-PCV(Samson) for Pasargad Oil Co. in Bitumen Production Plant in Abadan Refinery completed in 2015 | EPCIC project, 2 x 72MW 11KV substation (ABB) for Kuwait Oil Company in Substations in Gathering Center North Kuwait completed on 2014 | |||||||||
EPC-C project, DCS , ESD ( SIEMENS) for Arya Petro Gas Co./ ICOFC in Tabnak Gas Fields Development, Wellhead Facility & Pipeline completed on 2015. | EPCIC project, DCS (Honeywell TDC3000), ESD (ICS Triplex), ABC/BMS (Emerson DeltaV/SIS), 12.5MVA Power Plant (Caterpillar) for Kuwait Oil Company in Revamping of Desalting Plant in Gathering Center 23 completed on 2011 | |||||||||
EPCIC project, DCS (Honeywell) , Instrument ( ABB ) for Kermanshah Oil Refinery Co. completed on 2008. | EPCIC project, PLC (Allen Bradley 80/5) for Kuwait Cement Company in Bypass Section in Raw Mill Plant completed on 2008 | |||||||||
EPC-C project, DCS(SIEMENS) , Field Instruments for Kordestan Cement Co. in Cement mill Development completed on 2015. | EPCIC project, PLc (ABB), for Kuwait Cement Compnay in White Cement Mill Plant completed on 2002 | |||||||||
EPCIC project, DCS (SIEMENS) for Sepahan Cement Co. in Revamp of Cement Mill Line 1&2 completed on 2015. | ||||||||||
EPCIC project, PLC (SIEMENS) for Fakoor Sanat / Chador Malu Iron Ore Plant in Truck Loading Area completed on 2010. | ||||||||||
Ongoing | ||||||||||
Supplying F&G equipments of Yaran oil field well facilities project | ||||||||||
Construction plan for Abadan’s new pump houses and terminals and 40ml Mahshahr’s pump house | ||||||||||
Construction project of a 210-bed international hotel-hospital building and construction of two 500MW power plants in Lakestan | ||||||||||
Implementation of SCADA system for water and wastewater org. in regions 1, 2, 4 and 5 | ||||||||||
Purchasing 800 Yokogawa controllers | ||||||||||
Detailed designing, supplying and EPC execution of warehousing development tanks project For Bandar Abbas factory |